| Keystone IG was able to meet the very high specification and lead times required for this £250 million construction contract, designed by Benoy Architects. Keystone IG designed, manufactured and delivered specialstainless steel bow lintels to site in 7 days as required by the sub-contractor Ben Barrett Limited. This stunning project required lintels to be powder-coated after manufacture. Each lintel was then individually shrink-wrapped for additional on-site protection. A protective outer flange cover was factory fitted for removal after installation. This ensures the lintel flange remains aesthetically pleasing after construction is completed. |